Calibration Charts | Case = PSTA_FS1W , Cell = C1 | 05/31/05 | |||||||||||||||||
PSTA Field Scale Cell 1 | |||||||||||||||||||
Simulation Period | 09/06/00 | 04/03/03 | Limerock | ||||||||||||||||
Output Period: | 07/01/01 | 04/03/03 | |||||||||||||||||
Calibration Period: | 08/01/02 | 04/03/03 | |||||||||||||||||
Predicted Values for Calibration Period | Calibration Set: | PSTA_3 | Paired Observed & Predicted Values | FW | Not FW | GM / | |||||||||||||
Mean Depth | 40 | cm | K | 23.6 | m/yr | Depth | Flow | Load | FWM | GM | GM | FWM | |||||||
Frequency Z < 10 cm | 0% | C0 | 3.0 | ppb | cm | cm/d | mg/m2-d | ppb | ppb | ppb | - | ||||||||
Mean Hyd Load | 13.3 | cm/d | C1 | 22 | ppb | Count | 35 | 36 | 36 | 35 | 35 | 35 | |||||||
Mean P Load | 1278 | mg/m2-yr | C2 | 300 | ppb | Observed | 38.1 | 6.4 | 1.18 | 18.4 | 17.3 | 17.5 | 0.94 | ||||||
Mean Flow/Width | 39 | m2/day | Z1 | 0 | cm | Predicted | 40.3 | 6.2 | 0.83 | 13.5 | 12.9 | 12.6 | 0.96 | ||||||
Hydraulic Resid Time | 3 | days | Z2 | 100 | cm | Mean Resid | -2.1 | 0.3 | 0.35 | 4.9 | 4.4 | 4.9 | -0.01 | ||||||
Inflow Conc | 26 | ppb | Z3 | 400 | cm | Bias % | -5% | 4% | 42% | 36% | 34% | 39% | -1% | ||||||
FWM Outflow Conc | 13 | ppb | Avg Int | 7 | days | Residual SE% | 17% | 24% | 15% | 61% | 43% | 43% | |||||||
GeoMn Outflow Conc | 13 | ppb | Area | 0.0194 | km2 | ||||||||||||||
|
|||||||||||||||||||
green line on axis = calibration period | red symbols = observed | blue lines /symbols = predicted | Resid = observed - predicted, conc log-transformed |