Calibration Charts Case = STA34 ,  Cell  =  2B 05/31/05
STA-34            
Simulation Period 10/01/03 03/31/05              
Output Period: 10/01/03 03/31/05              
Calibration Period: 04/01/04 03/31/05              
Predicted Values for Calibration Period Calibration Set: SAV_3 Paired Observed & Predicted Values FW Not FW GM / 
Mean Depth 43 cm K 52.5 m/yr Depth Flow Load FWM GM GM FWM
Frequency Z < 10 cm 19% C0 3.0 ppb cm cm/d mg/m2-d ppb ppb ppb  -
Mean Hyd Load 4.5 cm/d C1 22 ppb Count 16 16 16 14 14 14
Mean P Load 693 mg/m2-yr C2 300 ppb Observed 43.7 5.7 1.13 20.0 20.0 20.0 1.00
Mean Flow/Width 131 m2/day Z1 40 cm Predicted 48.5 5.8 0.85 14.7 9.2 8.8 0.63
Hydraulic Resid Time 10 days Z2 100 cm Mean Resid -4.8 -0.2 0.28 5.3 10.8 11.2 0.37
Inflow Conc 42 ppb Z3 400 cm Bias % -10% -3% 33% 36% 118% 126% 60%
FWM Outflow Conc 14 ppb Avg Int 7 days Residual SE% 34% 150% 82% 173% 81% 81%
GeoMn Outflow Conc 9 ppb Area 11.712 km2
green line on axis  = calibration period red symbols = observed blue lines /symbols = predicted Resid = observed - predicted,   conc log-transformed