DMSTA Simulation Results   Case: GEORGE   Period: 2/20/1994 to 9/30/2003          
                               
Case: mainstem st john's river; tp excursion 2001-2003 unexplained; missing inflow data jan-july 2001; 14-day average inflows        
         
         
                               
Input Series   GEORGE_AVG     Tanks in Series   2.0 Surface Area (km2) 186.2507          
Simulation Period 02/21/89 thru 09/30/03 Mean Water Load  (cm/d) 5.6 Mean Depth (cm) 344          
Output Period   02/20/94 thru 09/30/03 Max Water Load (cm/d) 16.8 Max Depth (cm)   388          
Calib Period   02/20/95   12/31/00 Inflow Conc  (ppb) 52.4 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 1010 Load Reduction   -6%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 54.9 Conc Reduction   -5%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 54.9 Time Freq Conc > 10 ppb 100%          
K (m/yr)   0.054 Kd (m/yr) 0 95th Percentile (ppb) 77.3 K - SS, C*=4 ppb (m/yr) -0.3          
C1 (ppb)   150.0 Weir Depth (cm) 310 Outflow Geo. Mean (ppb) 53.1 Storage Turnover (1/yr) 0.1          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 53.1 Mean Stored P (mg/m2) 497          
C2 (ppb)   0 Qout Intercept 5.0 Seepage Loss   0% Storage Inc/Net Removal #N/A          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   64.2 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            