DMSTA Simulation Results   Case: HARNEY   Period: 10/1/1990 to 8/31/2003          
                               
Case: Lake Harney; B&M data; et rate questioned        
         
         
                               
Input Series   HARNEY     Tanks in Series   2.0 Surface Area (km2) 29.9297          
Simulation Period 10/02/85 thru 08/31/03 Mean Water Load  (cm/d) 18.0 Mean Depth (cm) 289          
Output Period   10/01/90 thru 08/31/03 Max Water Load (cm/d) 82.8 Max Depth (cm)   488          
Calib Period   10/01/91   08/31/03 Inflow Conc  (ppb) 81.4 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 5257 Load Reduction   1%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 80.1 Conc Reduction   2%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 80.1 Time Freq Conc > 10 ppb 99%          
K (m/yr)   1.628 Kd (m/yr) 0 95th Percentile (ppb) 105.3 K - SS, C*=4 ppb (m/yr) 1.6          
C1 (ppb)   150.0 Weir Depth (cm) 190 Outflow Geo. Mean (ppb) 73.5 Storage Turnover (1/yr) 4.9          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 73.5 Mean Stored P (mg/m2) 503          
C2 (ppb)   0 Qout Intercept 1.0 Seepage Loss   0% Storage Inc/Net Removal 3%          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   16.3 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05