DMSTA Simulation Results   Case: HARNEY_2   Period: 1/1/1989 to 12/31/1998          
                               
Case: Lake Harney - WSI data        
         
         
                               
Input Series   HARNEY_WS     Tanks in Series   2.0 Surface Area (km2) 24.5200          
Simulation Period 01/03/84 thru 12/31/98 Mean Water Load  (cm/d) 21.3 Mean Depth (cm) 199          
Output Period   01/01/89 thru 12/31/98 Max Water Load (cm/d) 98.6 Max Depth (cm)   364          
Calib Period   01/01/90   12/31/98 Inflow Conc  (ppb) 48.5 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 3712 Load Reduction   1%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 47.8 Conc Reduction   1%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 47.8 Time Freq Conc > 10 ppb 100%          
K (m/yr)   1.910 Kd (m/yr) 0 95th Percentile (ppb) 83.8 K - SS, C*=4 ppb (m/yr) 2.4          
C1 (ppb)   150.0 Weir Depth (cm) 0 Outflow Geo. Mean (ppb) 47.1 Storage Turnover (1/yr) 3.7          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 47.1 Mean Stored P (mg/m2) 314          
C2 (ppb)   0 Qout Intercept 0.1 Seepage Loss   0% Storage Inc/Net Removal 16%          
Zx  (cm)   40 Qout Exponent 3.0 HRT (days)   9.5 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05