DMSTA Simulation Results   Case: HELLNBLAZES Period: 3/1/1996 to 9/30/1999          
                               
Case: sparse inflow conc prior to 3/1996; high water load & short HRT (1 day)         
         
         
                               
Input Series   HELLNBLAZES     Tanks in Series   2.0 Surface Area (km2) 1.5400          
Simulation Period 01/02/90 thru 09/30/99 Mean Water Load  (cm/d) 116.5 Mean Depth (cm) 145          
Output Period   03/01/96 thru 09/30/99 Max Water Load (cm/d) 589.4 Max Depth (cm)   272          
Calib Period   01/01/97   09/30/99 Inflow Conc  (ppb) 159.9 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2556 Iterations -5 Inflow P Load (mg/m2-yr) 67812 Load Reduction   0%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 159.8 Conc Reduction   0%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 159.8 Time Freq Conc > 10 ppb 99%          
K (m/yr)   0.396 Kd (m/yr) 0 95th Percentile (ppb) 349.9 K - SS, C*=4 ppb (m/yr) 0.7          
C1 (ppb)   150.0 Weir Depth (cm) 0 Outflow Geo. Mean (ppb) 175.8 Storage Turnover (1/yr) 2.9          
C0  (ppb)   4.0 Cont Depth (cm) 100 Outflow GM,  Q>0 (ppb) 174.8 Mean Stored P (mg/m2) 1274          
C2 (ppb)   0 Qout Intercept 0.9 Seepage Loss   0% Storage Inc/Net Removal 44%          
Zx  (cm)   40 Qout Exponent 3.0 HRT (days)   1.2 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05