DMSTA Simulation Results   Case: ISTOKPOGA Period: 1/1/1988 to 9/30/2000          
                               
Case: data from Havens & Walker (2003)        
         
         
                               
Input Series   ISTOKPOGA_WS     Tanks in Series   2.0 Surface Area (km2) 110.0000          
Simulation Period 01/03/79 thru 09/30/00 Mean Water Load  (cm/d) 1.2 Mean Depth (cm) 171          
Output Period   01/01/88 thru 09/30/00 Max Water Load (cm/d) 11.5 Max Depth (cm)   231          
Calib Period   10/01/93   09/30/00 Inflow Conc  (ppb) 104.3 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 5385 Iterations -9 Inflow P Load (mg/m2-yr) 314 Load Reduction   63%          
Avg Interval (days) 90 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 41.9 Conc Reduction   60%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 41.9 Time Freq Conc > 10 ppb 68%          
K (m/yr)   4.904 Kd (m/yr) 0 95th Percentile (ppb) 59.8 K - SS, C*=4 ppb (m/yr) 4.1          
C1 (ppb)   150.0 Weir Depth (cm) 140 Outflow Geo. Mean (ppb) 36.4 Storage Turnover (1/yr) 9.4          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 37.2 Mean Stored P (mg/m2) 300          
C2 (ppb)   0 Qout Intercept 0.8 Seepage Loss   0% Storage Inc/Net Removal 0%          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   222.0 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05