DMSTA Simulation Results   Case: JESSUP   Period: 10/1/1994 to 6/30/2003          
                               
Case: Lake Jessup; outflow reversal treated as inflow        
         
         
                               
Input Series   JESSUP_BACK     Tanks in Series   2.0 Surface Area (km2) 53.0815          
Simulation Period 10/03/86 thru 06/30/03 Mean Water Load  (cm/d) 1.2 Mean Depth (cm) 162          
Output Period   10/01/94 thru 06/30/03 Max Water Load (cm/d) 16.9 Max Depth (cm)   318          
Calib Period   10/01/97   06/30/03 Inflow Conc  (ppb) 178.9 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 4016 Iterations -8 Inflow P Load (mg/m2-yr) 558 Load Reduction   34%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 103.7 Conc Reduction   42%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 103.7 Time Freq Conc > 10 ppb 100%          
K (m/yr)   2.266 Kd (m/yr) 0 95th Percentile (ppb) 114.2 K - SS, C*=4 ppb (m/yr) 2.2          
C1 (ppb)   150.0 Weir Depth (cm) 80 Outflow Geo. Mean (ppb) 102.0 Storage Turnover (1/yr) 9.9          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 102.0 Mean Stored P (mg/m2) 775          
C2 (ppb)   0 Qout Intercept 0.2 Seepage Loss   0% Storage Inc/Net Removal -1%          
Zx  (cm)   40 Qout Exponent 1.0 HRT (days)   171.8 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05