DMSTA Simulation Results   Case: OKEE_7599   Period: 1/1/1973 to 12/31/1999          
                               
Case: calib to 1975-1999; observed concs in pelagic zone; simulation affected by intial condition        
         
         
                               
Input Series   OKEECHOBEE     Tanks in Series   1.0 Surface Area (km2) 1732.0000          
Simulation Period 11/04/62 thru 12/31/99 Mean Water Load  (cm/d) 0.7 Mean Depth (cm) 265          
Output Period   01/01/73 thru 12/31/99 Max Water Load (cm/d) 2.6 Max Depth (cm)   363          
Calib Period   01/01/75   12/31/99 Inflow Conc  (ppb) 181.6 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 4441 Iterations -10 Inflow P Load (mg/m2-yr) 269 Load Reduction   73%          
Avg Interval (days) 90 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 73.3 Conc Reduction   60%          
Parameter Set:     none Mass B Error -0.1% Outflow C with Bypass 73.3 Time Freq Conc > 10 ppb 40%          
K (m/yr)   3.200 Kd (m/yr) 0 95th Percentile (ppb) 88.0 K - SS, C*=4 ppb (m/yr) 3.1          
C1 (ppb)   150.0 Weir Depth (cm) 0 Outflow Geo. Mean (ppb) 70.7 Storage Turnover (1/yr) 8.5          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 70.4 Mean Stored P (mg/m2) 462          
C2 (ppb)   0 Qout Intercept 0.0 Seepage Loss   0% Storage Inc/Net Removal -1%          
Zx  (cm)   40 Qout Exponent 0.0 HRT (days)   948.3 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05