DMSTA Simulation Results   Case: OKEE_9599   Period: 1/1/1992 to 12/31/1999          
                               
Case: calib to 1995-1999; observed concs in pelagic zone; simulation affected by intial condition        
         
         
                               
Input Series   OKEECHOBEE     Tanks in Series   1.0 Surface Area (km2) 1732.0000          
Simulation Period 01/04/79 thru 12/31/99 Mean Water Load  (cm/d) 0.8 Mean Depth (cm) 282          
Output Period   01/01/92 thru 12/31/99 Max Water Load (cm/d) 2.0 Max Depth (cm)   363          
Calib Period   01/01/95   12/31/99 Inflow Conc  (ppb) 157.5 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 5841 Iterations -10 Inflow P Load (mg/m2-yr) 270 Load Reduction   43%          
Avg Interval (days) 90 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 112.7 Conc Reduction   28%          
Parameter Set:     none Mass B Error -0.2% Outflow C with Bypass 112.7 Time Freq Conc > 10 ppb 46%          
K (m/yr)   1.170 Kd (m/yr) 0 95th Percentile (ppb) 121.0 K - SS, C*=4 ppb (m/yr) 1.2          
C1 (ppb)   150.0 Weir Depth (cm) 0 Outflow Geo. Mean (ppb) 112.5 Storage Turnover (1/yr) 4.8          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 111.8 Mean Stored P (mg/m2) 743          
C2 (ppb)   0 Qout Intercept 0.0 Seepage Loss   0% Storage Inc/Net Removal 2%          
Zx  (cm)   40 Qout Exponent 0.0 HRT (days)   734.7 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05