DMSTA Simulation Results   Case: POINSETT   Period: 10/1/1973 to 5/31/1998          
                               
Case: depths estimated; inflow P data sparse after 1990;        
         
         
                               
Input Series   POINSETT     Tanks in Series   2.0 Surface Area (km2) 17.5400          
Simulation Period 10/02/68 thru 05/31/98 Mean Water Load  (cm/d) 13.8 Mean Depth (cm) 98          
Output Period   10/01/73 thru 05/31/98 Max Water Load (cm/d) 89.7 Max Depth (cm)   211          
Calib Period   10/01/74   09/30/90 Inflow Conc  (ppb) 99.5 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 4866 Load Reduction   8%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 91.7 Conc Reduction   8%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 91.7 Time Freq Conc > 10 ppb 100%          
K (m/yr)   5.623 Kd (m/yr) 0 95th Percentile (ppb) 135.8 K - SS, C*=4 ppb (m/yr) 4.8          
C1 (ppb)   150.0 Weir Depth (cm) 0 Outflow Geo. Mean (ppb) 75.9 Storage Turnover (1/yr) 19.3          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 75.9 Mean Stored P (mg/m2) 543          
C2 (ppb)   0 Qout Intercept 0.9 Seepage Loss   0% Storage Inc/Net Removal -2%          
Zx  (cm)   40 Qout Exponent 3.0 HRT (days)   7.3 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05