DMSTA Simulation Results   Case: RODMAN   Period: 2/1/1981 to 12/31/2002          
                               
Case: Rodman Reservoir; no outflow P data 1991-1997        
         
         
                               
Input Series   RODMAN     Tanks in Series   4.0 Surface Area (km2) 29.9297          
Simulation Period 02/03/76 thru 12/31/02 Mean Water Load  (cm/d) 9.9 Mean Depth (cm) 262          
Output Period   02/01/81 thru 12/31/02 Max Water Load (cm/d) 63.1 Max Depth (cm)   418          
Calib Period   02/01/82   12/31/90 Inflow Conc  (ppb) 52.0 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 1822 Load Reduction   33%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 34.7 Conc Reduction   33%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 34.7 Time Freq Conc > 10 ppb 100%          
K (m/yr)   20.378 Kd (m/yr) 0 95th Percentile (ppb) 52.0 K - SS, C*=4 ppb (m/yr) 17.6          
C1 (ppb)   150.0 Weir Depth (cm) 160 Outflow Geo. Mean (ppb) 28.2 Storage Turnover (1/yr) 30.5          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 28.2 Mean Stored P (mg/m2) 218          
C2 (ppb)   0 Qout Intercept 3.0 Seepage Loss   0% Storage Inc/Net Removal 0%          
Zx  (cm)   40 Qout Exponent 2.0 HRT (days)   27.1 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05