DMSTA Simulation Results   Case: THONOTO   Period: 10/1/1980 to 9/30/1991          
                               
Case: Lake Thonotosassa; inflows not gauged; inflow time series smoothed (14-day rolling average) to eliminate negative inflows        
         
         
                               
Input Series   THONOTO_AVG     Tanks in Series   2.0 Surface Area (km2) 3.3200          
Simulation Period 10/03/75 thru 09/30/91 Mean Water Load  (cm/d) 3.1 Mean Depth (cm) 152          
Output Period   10/01/80 thru 09/30/91 Max Water Load (cm/d) 45.0 Max Depth (cm)   349          
Calib Period   10/01/81   09/30/91 Inflow Conc  (ppb) 1095.6 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 2190 Iterations -5 Inflow P Load (mg/m2-yr) 11249 Load Reduction   34%          
Avg Interval (days) 30 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 749.7 Conc Reduction   32%          
Parameter Set:     none Mass B Error 0.0% Outflow C with Bypass 749.7 Time Freq Conc > 10 ppb 100%          
K (m/yr)   4.710 Kd (m/yr) 0 95th Percentile (ppb) 1132.9 K - SS, C*=4 ppb (m/yr) 4.6          
C1 (ppb)   150.0 Weir Depth (cm) 120 Outflow Geo. Mean (ppb) 710.3 Storage Turnover (1/yr) 158.3          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 711.2 Mean Stored P (mg/m2) 5633          
C2 (ppb)   0 Qout Intercept 0.3 Seepage Loss   0% Storage Inc/Net Removal 0%          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   56.0 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05