DMSTA Simulation Results   Case: Design_AA   Period: 1/1/1965 to 12/31/1995          
                               
Case: EAA Storage Reservoir - 12 ft Max Depth - B&M BSFS 2002        
         
         
                               
Input Series   design_aa     Tanks in Series   1.0 Surface Area (km2) 121.4859          
Simulation Period 01/04/55 thru 12/31/95 Mean Water Load  (cm/d) 2.8 Mean Depth (cm) 209          
Output Period   01/01/65 thru 12/31/95 Max Water Load (cm/d) 21.8 Max Depth (cm)   345          
Calib Period   01/01/65   12/31/95 Inflow Conc  (ppb) 100.0 Freq Depth <  5 cm 0.0%          
Startup Interval (days) 3650 Iterations -10 Inflow P Load (mg/m2-yr) 882 Load Reduction   23%          
Avg Interval (days) 90 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 79.1 Conc Reduction   21%          
Parameter Set:     RESERV Mass B Error -0.1% Outflow C with Bypass 79.1 Time Freq Conc > 10 ppb 74%          
K (m/yr)   3.200 Kd (m/yr) 0 95th Percentile (ppb) 85.6 K - SS, C*=4 ppb (m/yr) 3.1          
C1 (ppb)   150.0 Weir Depth (cm) 30 Outflow Geo. Mean (ppb) 76.7 Storage Turnover (1/yr) 9.0          
C0  (ppb)   4.0 Cont Depth (cm) 5 Outflow GM,  Q>0 (ppb) 76.9 Mean Stored P (mg/m2) 497          
C2 (ppb)   0 Qout Intercept 5.0 Seepage Loss   0% Storage Inc/Net Removal 0%          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   88.6 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05