DMSTA Simulation Results   Case: Design_C   Period: 1/1/1965 to 12/31/1995          
                               
Case: EAA Reservoir C - SFWMD Basin Spec Feas Study 2002        
         
         
                               
Input Series   design_C     Tanks in Series   1.0 Surface Area (km2) 51.8263          
Simulation Period 01/04/55 thru 12/31/95 Mean Water Load  (cm/d) 0.7 Mean Depth (cm) 80          
Output Period   01/01/65 thru 12/31/95 Max Water Load (cm/d) 4.7 Max Depth (cm)   207          
Calib Period   01/01/65   12/31/95 Inflow Conc  (ppb) 100.0 Freq Depth <  5 cm 4.0%          
Startup Interval (days) 3650 Iterations -10 Inflow P Load (mg/m2-yr) 119 Load Reduction   58%          
Avg Interval (days) 90 Wtr Bal Error 0.0% Outflow FWM  Conc (ppb) 42.5 Conc Reduction   57%          
Parameter Set:     RESERV Mass B Error -0.2% Outflow C with Bypass 42.5 Time Freq Conc > 10 ppb 28%          
K (m/yr)   3.200 Kd (m/yr) 0 95th Percentile (ppb) 51.1 K - SS, C*=4 ppb (m/yr) 2.8          
C1 (ppb)   150.0 Weir Depth (cm) 30 Outflow Geo. Mean (ppb) 55.4 Storage Turnover (1/yr) 4.5          
C0  (ppb)   4.0 Cont Depth (cm) 0 Outflow GM,  Q>0 (ppb) 38.4 Mean Stored P (mg/m2) 219          
C2 (ppb)   0 Qout Intercept 5.0 Seepage Loss   0% Storage Inc/Net Removal 0%          
Zx  (cm)   40 Qout Exponent 1.5 HRT (days)   246.4 Outfl. Seepage (cm/d/cm) 0          
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
 
                             
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
                               
Obs Load2 = Predicted Flow x Observed Conc                        
Green lines on x axis of concentration plots indicate model calibration period.  Statistics at top of sheet are for entire output period.            
03/02/05