DMSTA Simulation Results Case: PP_11_SR Period: 04/06/99 to 10/02/00
Case: PSTA Research, TMT = PP_11, UNIT = PORTA 23, Substrate = SR
Input Series PP_11 Tanks in Series 1.5 Surface Area (km2) 0.0000
Simulation Period 04/06/99 thru 10/02/00 Mean Water Load  (cm/d) 7.9 Bypass Volume 0.0%
Output Period 04/06/99 thru 10/02/00 Max Water Load (cm/d) 13.1 Mean Depth (cm) 34
Startup Interval (days) 178 Iterations 1 Inflow Conc  (ppb) 24.4 Max Depth (cm) 40
Avg Interval (days) 7 Inflow P Load (mg/m2-yr) 790 Freq Depth <  5 cm 0.0%
Parameter Set:   none Outflow FWM  Conc (ppb) 19.7 Load Reduction 19%
K  (m/yr) 15.88 Sm (mg/m2)  0 Outflow C with Bypass 19.7 Time Freq Conc > 10 ppb 100%
C1 (ppb) 22.0 Sp (mg/m2) 0 95th Percentile (ppb) 39.7 Vol Freq Conc > 10 ppb 100%
C0  (ppb) 4.0 Qout Intercept 0.0 Outflow Geo. Mean (ppb) 19.6 Storage Turnover (1/yr) 1.5
Zx  (cm) 0 Qout Exponent 0.0 Outflow GM,  Q>0 (ppb) 19.6 Mean Stored P (mg/m2) 414
Wtr Bal Error 0.0% Knet-Plug Flow (m/yr) 14.1 Storage Inc/Net Removal 68%
Mass B Error -0.2% Knet-NCSTR (m/yr) 16.7 Outfl. Seepage (cm/d/cm) 0
Calibration  Statistics for Period: 10/01/99 thru 10/02/00 Mean Mean
Count Observed Predicted Residual Resid% RSE% R2
Mean Depth (cm) 53 34.2 34.2 0.0 0% 0% 100%
Flow (cm/day) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Flow-Wtd-Mean Conc (ppb) 53 17.2 17.4 -0.2 -1%
Geometric Mean Conc (ppb) 53 17.2 17.3 -0.1 -1% 20% 32%
Mean Conc (ppb) 53 17.7 17.5 0.2 1% 21% 25%
Outflow Load (mg/m2-d) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Pred Q x Conc (mg/m2-d) 53 1.47 1.48 -0.02 -1% 21% 30%
 
 
Obs Load2 = Predicted Flow x Obs Conc
Green lines on x axis of concentration plots indicate model calibration period.
06/07/02