DMSTA Simulation Results Case: SAV_Deep Period: 07/20/98 to 11/06/00
Case: SAV Deep (120 cm) Mesocosm at North Test Site; Fixed Depth (120 cm) Then Variable (40 - 120 cm);biomass harvested nov 1999, then returned to tank
Input Series sav_z120 Tanks in Series 1.3 Surface Area (km2) 0.0000
Simulation Period 07/20/98 thru 11/06/00 Mean Water Load  (cm/d) 10.3 Bypass Volume 0.0%
Output Period 07/20/98 thru 11/06/00 Max Water Load (cm/d) 10.0 Mean Depth (cm) 113
Startup Interval (days) 621 Iterations 1 Inflow Conc  (ppb) 115.1 Max Depth (cm) 120
Avg Interval (days) 7 Inflow P Load (mg/m2-yr) 3924 Freq Depth <  5 cm 0.0%
Parameter Set:   none Outflow FWM  Conc (ppb) 27.5 Load Reduction 76%
K  (m/yr) 78.61 Sm (mg/m2)  0 Outflow C with Bypass 27.5 Time Freq Conc > 10 ppb 100%
C1 (ppb) 22.0 Sp (mg/m2) 0 95th Percentile (ppb) 34.8 Vol Freq Conc > 10 ppb 100%
C0  (ppb) 4.0 Qout Intercept 0.0 Outflow Geo. Mean (ppb) 26.6 Storage Turnover (1/yr) 14.4
Zx  (cm) 60 Qout Exponent 0.0 Outflow GM,  Q>0 (ppb) 26.6 Mean Stored P (mg/m2) 1718
Wtr Bal Error 0.0% Knet-Plug Flow (m/yr) 52.5 Storage Inc/Net Removal 25%
Mass B Error 0.0% Knet-NCSTR (m/yr) 96.2 Outfl. Seepage (cm/d/cm) 0
Calibration  Statistics for Period: 04/01/00 thru 11/06/00 Mean Mean
Count Observed Predicted Residual Resid% RSE% R2
Mean Depth (cm) 32 95.6 95.5 0.1 0% 1% 100%
Flow (cm/day) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Flow-Wtd-Mean Conc (ppb) 32 35.3 35.6 -0.3 -1%
Geometric Mean Conc (ppb) 32 34.7 34.8 0.0 0% 25% 0%
Mean Conc (ppb) 32 35.3 35.4 0.0 0% 28% 0%
Outflow Load (mg/m2-d) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Pred Q x Conc (mg/m2-d) 32 3.48 3.51 -0.03 -1% 28% 24%
 
 
Obs Load2 = Predicted Flow x Obs Conc
Green lines on x axis of concentration plots indicate model calibration period.
06/07/02