DMSTA Simulation Results Case: STAOpt_9N Period: 01/01/99 to 10/31/01
Case: STA Optimization test cells 09 North (High HLR - Then Pulsed)
Input Series STAOpt09N Tanks in Series 6.0 Surface Area (km2) 0.0022
Simulation Period 08/01/98 thru 10/31/01 Mean Water Load  (cm/d) 9.6 Bypass Volume 0.0%
Output Period 01/01/99 thru 10/31/01 Max Water Load (cm/d) 21.1 Mean Depth (cm) 93
Startup Interval (days) 823 Iterations 1 Inflow Conc  (ppb) 69.1 Max Depth (cm) 114
Avg Interval (days) 7 Inflow P Load (mg/m2-yr) 1095 Freq Depth <  5 cm 0.0%
Parameter Set:   none Outflow FWM  Conc (ppb) 32.4 Load Reduction 53%
K  (m/yr) 23.93 Sm (mg/m2)  0 Outflow C with Bypass 32.4 Time Freq Conc > 10 ppb 90%
C1 (ppb) 22.0 Sp (mg/m2) 0 95th Percentile (ppb) 38.8 Vol Freq Conc > 10 ppb 100%
C0  (ppb) 4.0 Qout Intercept 0.0 Outflow Geo. Mean (ppb) 27.9 Storage Turnover (1/yr) 4.9
Zx  (cm) 60 Qout Exponent 0.0 Outflow GM,  Q>0 (ppb) 28.4 Mean Stored P (mg/m2) 1868
Wtr Bal Error 0.0% Knet-Plug Flow (m/yr) 26.2 Storage Inc/Net Removal 37%
Mass B Error 0.0% Knet-NCSTR (m/yr) 28.0 Outfl. Seepage (cm/d/cm) 0
Calibration  Statistics for Period: 11/01/00 thru 09/30/01 Mean Mean
Count Observed Predicted Residual Resid% RSE% R2
Mean Depth (cm) 48 92.7 92.5 0.2 0% 1% 97%
Flow (cm/day) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Flow-Wtd-Mean Conc (ppb) 43 32.9 27.8 5.0 18%
Geometric Mean Conc (ppb) 43 28.1 29.6 -1.5 -5% 30% 0%
Mean Conc (ppb) 43 29.5 29.8 -0.3 -1% 31% 7%
Outflow Load (mg/m2-d) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Pred Q x Conc (mg/m2-d) 48 1.21 1.02 0.18 18% 66% 85%
 
 
Obs Load2 = Predicted Flow x Obs Conc
Green lines on x axis of concentration plots indicate model calibration period.
06/07/02