DMSTA Simulation Results Case: STAOpt_15S_C_T Period: 10/27/99 to 03/31/02
Case: STA Optimization test cells 15 South (Control HLR)
Input Series STAOpt15S Tanks in Series 6.0 Surface Area (km2) 0.0022
Simulation Period 10/27/99 thru 03/31/02 Mean Water Load  (cm/d) 3.4 Bypass Volume 0.0%
Output Period 10/27/99 thru 03/31/02 Max Water Load (cm/d) 5.6 Mean Depth (cm) 78
Startup Interval (days) 371 Iterations 1 Inflow Conc  (ppb) 25.3 Max Depth (cm) 85
Avg Interval (days) 7 Inflow P Load (mg/m2-yr) 287 Freq Depth <  5 cm 0.0%
Parameter Set:   EMERG Outflow FWM  Conc (ppb) 11.1 Load Reduction 56%
K  (m/yr) 15.70 Sm (mg/m2)  0 Outflow C with Bypass 11.1 Time Freq Conc > 10 ppb 100%
C1 (ppb) 22.0 Sp (mg/m2) 0 95th Percentile (ppb) 12.0 Vol Freq Conc > 10 ppb 100%
C0  (ppb) 4.0 Qout Intercept 0.0 Outflow Geo. Mean (ppb) 11.0 Storage Turnover (1/yr) 1.1
Zx  (cm) 60 Qout Exponent 0.0 Outflow GM,  Q>0 (ppb) 11.0 Mean Stored P (mg/m2) 535
Wtr Bal Error 0.0% Knet-Plug Flow (m/yr) 10.5 Storage Inc/Net Removal 23%
Mass B Error 0.0% Knet-NCSTR (m/yr) 11.4 Outfl. Seepage (cm/d/cm) 0
Calibration  Statistics for Period: 11/01/00 thru 09/30/01 Mean Mean
Count Observed Predicted Residual Resid% RSE% R2
Mean Depth (cm) 47 78.3 78.3 0.0 0% 0% 100%
Flow (cm/day) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Flow-Wtd-Mean Conc (ppb) 47 26.9 11.0 15.9 145%
Geometric Mean Conc (ppb) 47 24.7 10.9 13.9 127% 87% 0%
Mean Conc (ppb) 47 26.2 10.9 15.3 140% 66% 0%
Outflow Load (mg/m2-d) 0 #N/A #N/A #N/A #N/A #N/A #N/A
Pred Q x Conc (mg/m2-d) 47 0.80 0.33 0.47 145% 71% 0%
 
 
Obs Load2 = Predicted Flow x Obs Conc
Green lines on x axis of concentration plots indicate model calibration period.
06/11/02